COLEVO | SUSTAINABLE LIGHTWEIGHT CONSTRUCTIONS A3 COMPOSITES
F E D

Passerelle Route de Drize, Carouge (GE)

COLEVO composite deck on Steel structure for fast installation of the bridge

  • 23.4 x 4.3 m
  • 5 deck-plates, structurally bonded to steel structure
  • SIA 260 / 261 pedestrian load & 5 t maintenance vehicle load
  • COLEVO deck weights only 49 kg/m2
  • Curved central section with 138 m radius produced in simple mold

Installation 9.2014

Project realized in cooperation with T ingénierie SA and Sottas SA

 

  • Traffic clearance requirements fulfilled while keeping minimum construction height
  • Lean architecture with continuous bridge arc and shape
  • Fast installation of fully preassembled central section
  • Minimal traffic interruption
  • No intervention over the road after installation
  • Durability
 
Pictures of installation: T ingénierie SA












 
Legal | ©2012 by COLEVO