Pedestrian and Bicycle Bridge Deck for Woodbridge, Bremgarten (AG)

COLEVO composite deck on wood/steel construction, for save and fast installation of the bridge

  • End-to-end deck plate 35.7 x 3.5 m, structurally bonded jointless with 3 panels, placed centrally and fixed on steel structure
  • SIA 260 / 261 pedestrian load, special load 90 kN
  • Weight only 87 kg/m2

Installation 7.2015
Project executed in cooperation with
Waser Baumanagement & Co, Hüsser Holzleimbau AG, Stadelmann und Stutz AG

Advantages:

  • Continuous bridge deck plate, with high grip and water drainage for safety
  • Quick installation of prefabricated bridge as one element
  • Minimal traffic interruption
  • No work over road after installation
  • High durability












 